| Above, the trench work getting started. Photo by Armand Vaquer. |
The work to install an electrical power line to the GOCO Beast Barn today.
I was expecting them during the late morning/early afternoon hours. I was watching for them to arrive but saw nothing. Then, after a while, I heard a motor going but couldn't tell where it was coming from. Then I stepped outside and saw the workers (3 of them) beginning to make a long trench.
![]() |
| Above, the trench is almost halfway to the power pole. Photo by Armand Vaquer. |
I went over there in the Jeep as it was still wet, snowy and muddy in spots.
It seemed to take about a couple of hours for the trencher machine to cut the 120 foot trench. Some parts of the ground may still have been frozen.
![]() |
| Above, the trench is almost halfway to the power pole. Photo by Armand Vaquer. |
After they cut the trench, they left for an hour or so to return the trencher and to get more conduit pipe.
![]() |
| Above, the end of the power line is standing up by the GOCO Beast Barn. Photo by Armand Vaquer. |
When they got back, they buried the conduit piping and filled the trench after doing so.
![]() |
| Above, The Beast in the GOCO Beast Barn. Photo by Armand Vaquer. |
The sun was getting very low and they were done for the day. They will either return to finish up in the late afternoon tomorrow or on Monday.